Note that you can duplicate existing views. Choose the views, right and click - duplicate views.
It looks like people didn't see Erel's comment above.
@
Erel
I have been doing just that and it works.. the only thing I can say is that when I paste the copied views to another
parent then the views' Left and Top properties are all 0 (zero).. All are stuffed in the top left corner.. so I had to drag them
one by one to new locations.. this means designing the layout again.
Is it possible that the coordinates of the views are stored in a temporary table with two fields, then placed one by one according to
that table and then delete the table?